EV Charging for Fleets and Depots – AC & DC Chargers for Buses, Trucks, Cabs and 2W/3W Fleets

CELECTRIC makes and installs EV chargers for fleet depots across India. Our chargers are made at our own plant in Sonipat, Haryana, in 8 models from 3.3 kW to 240 kW. They support OCPP, connect to the CELECTRIC EV app and come with 24×7 support and a 1-year warranty.

Get a Quote for Your DepotWhatsApp +91 93556 13613Call +91 93556 13613

Which Charger for Which Fleet

Fleet typeRecommended CELECTRIC chargerWhy
E-buses and trucks240 kW DC, 120 kW DC or 60 kW DC (CCS2)All three can charge buses and trucks; choose by how much time vehicles have between trips
Cab and car delivery fleets60 kW or 120 kW DC; 7.2 / 22 kW AC overnightDC for quick top-ups between shifts, AC for cars parked overnight
E-rickshaws and 2W delivery fleets10 kW AC (three sockets) or 3.3 kW ACThe 10 kW charges three 2- or 3-wheelers at once
Mixed fleetsAC for overnight + a few DC fast chargersKeeps electricity load and cost under control while covering urgent top-ups

Planning EV Charging for a Depot

  1. Count your vehicles and daily kilometres: how many vehicles, which types, and how far each runs per day.
  2. Decide when they charge: overnight at the depot, between shifts, or both.
  3. Work out the power load: this decides the electricity connection and how many chargers can run at once. We help you with the application for the electricity connection.
  4. Plan the bays and guns: CELECTRIC DC chargers of 60, 120 and 240 kW have two CCS2 guns, so two vehicles can be connected to one charger.
  5. Plan for growth: leave space and power for more chargers as your fleet grows.
Not sure where to start? Share your fleet size, vehicle types and city in the form below, and the CELECTRIC team will suggest a charger mix for your depot.

Managing Your Fleet’s Charging

  • RFID cards for drivers, so only your vehicles can charge.
  • CELECTRIC EV app to see charging sessions, usage and costs.
  • OCPP support so chargers can work with OCPP-based charging management software.
  • Wi-Fi, Ethernet and GSM connectivity to keep chargers online at different sites.
  • Remote monitoring and 24×7 support from the CELECTRIC team.

How CELECTRIC Sets Up a Depot

  1. Site visit: we check your depot, vehicles and parking layout.
  2. Load plan: we recommend the charger mix and the power you need.
  3. Electricity connection: we help you with the application.
  4. Installation: typically about 48 hours on site per location once ready.
  5. Go live: chargers are tested, connected to the CELECTRIC EV app and supported 24×7.

Why Fleets Choose CELECTRIC

  • Our own manufacturing at our plant in Sonipat, Haryana; head office in Nagpur.
  • One supplier for the whole depot: AC 3.3, 7.2, 10 and 22 kW and DC 30, 60, 120 and 240 kW.
  • Proven: 300+ charging stations installed across India.
  • Open and connected: OCPP, RFID and the CELECTRIC EV app.
  • Support: 24×7 customer support and a 1-year warranty on every model.

Read more: DC fast chargers · commercial EV charging stations · EV charging station cost in India · charging station installation · EV chargers for charge point operators

Frequently Asked Questions

Which CELECTRIC charger is best for an e-bus or truck depot?

The CELECTRIC 60 kW, 120 kW and 240 kW DC fast chargers can all charge buses and trucks. The 240 kW suits large depots where vehicles must charge quickly between trips; 60 kW or 120 kW suits smaller depots or longer stops.

How many chargers does a fleet of 20 vehicles need?

It depends on daily kilometres, battery size and how long vehicles stay at the depot. Vehicles parked overnight can share fewer, slower chargers; vehicles that charge between shifts need more DC fast chargers. The CELECTRIC team works this out with you during the site visit.

Can one depot use both AC and DC chargers?

Yes. Many fleets use AC chargers for overnight charging and a few DC fast chargers for quick daytime top-ups. CELECTRIC makes both, from 3.3 kW to 240 kW.

Do CELECTRIC chargers work with fleet charging management software?

CELECTRIC chargers support OCPP, the open standard used by charging management software, and connect over Wi-Fi, Ethernet or GSM. Usage can also be seen in the CELECTRIC EV app.

Does CELECTRIC help with the electricity connection for a depot?

Yes. We work out the power load your depot needs and help you with the application for the electricity connection.

How long does installation take?

Typical installation takes about 48 hours on site per location once the site and electricity connection are ready.

Get a Quote for Your Fleet Depot

Tell us your fleet size, vehicle types (buses, trucks, cars, e-rickshaws or 2-wheelers) and city. The CELECTRIC team will suggest the right charger mix and send a quotation, including installation.

    Tell Us Your Requirement

    Fill in your details and our EV experts will get back to you within 24 hours.

    Email: sales@celectricmobility.com · info@celectricmobility.com

    Scroll to Top